Customer FEEDBACK

Structural | Rooflights + Atria | Aluminium

We truly value our clients and the repeat business generated from the relationships built with like‐minded companies.

This is a snapshot of some of the companies we have worked with in recent times:

  • City West, Salford
  • Rhyl High School
  • Ysgol Glan Clwyd

I chose RED systems purely on their reputation for cost and quality. I found RED Systems
delivered within the budget, great quality and safety on the Glan Clwyd High School project. I really enjoyed working with RED Systems from design to site. My overall experience was very good and I would highly recommend RED Systems in the future.
Brian Hanlon Construction Manager, Willmott Dixon

  • Caspian House, Bootle
  • Halton Housing, Widnes
  • 3 St Peter’s Square, Manchester

When appointing the right glazing subcontractor for a project, I look for good quality, safety conscious operatives, and the ability to deliver within budget. Our previous project at Halton went well ‐ it arrived on time and comfortably within budget.
The aftercare I received was good and any issues were dealt with swiftly.
I was very pleased with the service provided on the project at Halton. This positive experience was a factor when awarding RED Systems a
much larger and ongoing project at St Peter’s Square.
Dave Gana Project Manager, Russells Construction

  • York University
  • Chester Bus Interchange
  • Coupland Building, Manchester

The project for the Coupland Building, Manchester University went very well and the handover was straightforward. I was very happy with the level of safety and the quality of RED Systems’ solutions. I would be very happy to recommend RED Systems in the future.
Andy Wertylo Senior Site Manager, Graham Construction

  • Studley Castle, Warwickshire
  • Dalston Curve Retail Units, London

We used Red Systems on the prestigious Studley castle development, from the offset up until completion they provided a quality, user-friendly service. RED went over and beyond with both safety and quality, I would not hesitate to use RED again or to recommend them to others.
Kabir Rasool Senior Site Manager, BAM Construction

  • Block 1 The Quarter, Liverpool
  • Block 4 The Quarter, Liverpool

Having engaged RED Systems as our design & installation sub‐contractor, they successfully completed a combined delivery of £0.9m of windows and curtain walling systems, over our scheme at The Quarter, Liverpool. Delivering the schemes within the core parameters of time, cost and quality and being approachable with the concerted achievement of design and wholesale project collaboration, for successful project delivery. A recommended solid subcontractor.
Steve Turner Vermont Construction

Chester Bus Interchange
Chester Bus Interchange
Fountainbridge
Nottingham Station
Woodchurch

More case studies

Case Studies 

Quality

Contact Us

Operating Since
2004

tYPICAL PROJECT VALUE
£200K TO £3.5M

Staff
30

Staff retention
95%

our suppliers